Dove Energy Limited
Date: May, 1999
Equipment: Flanges and valves
Oil & Gas Development Corporation
Country: Pakistan
Date: May 1999
Scope: 20% Cost of work completed by SPEC (Basic Engineering, detail Design, installation supervision and Commissioning)
Engineering, Installation and commissioning of Gas Production Field Development for Nine (9) Wells, Gathering Station and transport lines. SCADA system. Equipment included Manifolds, Pig Launchers, Pig Receivers, Separators, Knock Out Drums, Metering Skids, Chemical Injection Skids, Instruments, Fuel gas Conditioning Skids, Gas quality Monitoring System.
DESCON /OGDCL
Country: Pakistan
Date: December 1998
Scope: 20% Cost of work completed by SPEC (Basic Engineering, detail Design, installation supervision and Commissioning)
Engineering, Installation and commissioning of Gas Production Field Development for Five (5) Wells, Gathering Station and transport lines. SCADA system based on DCS. Equipment included Dehydration Plant, Manifolds, Pig Launchers, Pig Receivers, Separators, Knock Out Drums, Metering Skids, Flares, Gas treating/Conditioning Packages, Chemical Injection Skids, Gas Analyzers, Instruments.
Oil & Gas Development Corporation
Country: Pakistan
Date: October 30, 1998
Scope: 20% Cost of work completed by SPEC
Ten (10) Skid Mounted three phase Separators knock out drums, including two high pressure, four low pressure and four test separators/Knock Out Drums. One 3.5 MM BTU/Hr Indirect Heater. All units are PLC based with electro / pneumatic control valves.
Saudi Basic Industries Corporation (SABIC)
Country: Saudi Arabia
Date: July-Oct 2003
Scope: Caustic Injection System, 304 Stainless Steel Vessel, Mixer, 100% Stand By Pumps.
Exxon Mobile
Hyundai, Korea
FPSO, Kizomba B
Date: March-Oct 2003
Scope: Carbon Steel Vertical Vessel, ASME Code, DNV Certification, ABS approved design for Floating Production Storage and offloading vessel
|